PILOT HOLE

It is the first and most important phase of the process because in this first stage,  positioning of the equipment must be controlled during drilling to prevent twists and turns due to changing soils.

PHASE HDD
PRODUCT PURPOSE
PILOT HOLE
BENTONITE 
POLYMER

Formulate and fill the hole with drilling fluid.
REAMING (ENLARGE)
BENTONITE
POLYMER
SHALE INHIBITOR
FOAMING
BARITA
Keep the hole stability, removing cuttings, shale inhibitor, act as lubticant for tools, compesating hidrostatic pressure. 
PLACING OF PIPES BENTONITE
POLYMER
SHALE INHIBITOR
Keep the hole stability, lubricate the tools and improve the yield of drilling process.


 

 

 
TDS Polymers
T.D.S Bentonite


TDS Shale Inhibitor
  QUIMAFLUX ST
  QUIMAFLUX GP
  QUIMAFLUX LIG
  QUIMAFLUX TP
TDS Liquid Polymer
TDS Specific Additives
© Quimacer
Ctra. Castellón-Alcora, Km. 19,5 | 12110 Alcora (Castellón) España
Tel. +34 964 257242 | Fax. +34 964 253418 | info@quimacer.com